Jiupao Bridge North wiring project north of Desheng Road East Lake Express road, south of Qiantang River Jiupao Bridge, is connected to the three major cities of Hangzhou (Linping City, Jiangnan City, Xiashacheng) urban express, including steel box girder part by our company to build, the largest span of 80 meters, the engineering volume of about 8,000 tons。
From west to east, the elevated main line crosses Moganshan Road, Hushu North Road and other intersections as well as the Beijing-Hangzhou Canal and Baochu North Road。The bridge project consists of viaducts, elevated ramps and ground canal Bridges, most of which are made of steel box beams, especially double-layer steel box beams across canals, with a maximum span of 80 meters and a project volume of 9,200 tons。
Hangzhou Qiutao South Road reconstruction and upgrading (Qingjiang Road Interchange - Fuxing Interchange) project starts from the east of Fuxing Interchange in the south, and connects with the main line of Fuxing Road after the current Fuxing interchange reconstruction;North to the south of Qingjiang Interchange, and Qiushi III reserved viaduct connection。 The whole line is elevated, the total length is about 3.27KM, where the elevated bridge across Wangjiang Road, Dongbao Road and Wujiang Road using equal height all welded steel box girder structure, the maximum span of 80 meters...
Shifu Road improvement project (Chuxin Road - west of Fengqing Road) is Hangzhou. The northernmost "One Cross" in the "three vertical and five horizontal" express network is an important east-west road in the north of Hangzhou. This section contains a total of 5 steel box beams with a maximum span of 90 meters。The maximum installation height is 31 meters, and the total engineering volume is about 8200 tons。
Genshan Road Upgrading (Pengbu Interchange - Donghu Road) project IV is located at the intersection of Donghu Road and Xiasha Road in Hangzhou。The project consists of 19 steel box beams, including 1 steel box girder for main line, 17 steel box girder for ramp bridge and 3 steel box girder for split width bridge。 It is a fully interworking steel box girder interchange, with a total engineering volume of 11,000 tons。
This section is for the joint upgrading project from Kangqiao Road to Shangtang Road: the ground road starts from Gou Yun Road in the south and ends at the south side of Xuanhang Railway in the north. The design starting point is pile No. K0+013.732, terminal number K2+170 Total length 2156.268KM, elevated south from Yuzhai Road (Wangjiaqiao Road), starting pile number K0+423.8, the elevated extends north to K1+998.25, elevated full line length 1.58KM。 Among them, the steel box girder part is 6,000 tons, and the maximum span is 60 meters.
0572-8251967
Email: zjsrsz@163.com
Add: No.118 Hengtangqiao Road, Zhongguan Town, Deqing County, Huzhou City, Zhejiang Province
Copyright ©2019 Zhejiang Jushi Bridge Steel Structure Co., LTD. All Rights Reserved. Zhejiang ICP No. 2023008720-1
Zhejiang Jushi bridge steel structure Co., LTD